* * * Latest reports suggest that
MPV Vevey
will now spend the early winter period
based at Lausanne rather than Geneva
(originally planned to cover the earlier finish of
PS Savoie in 2007
which is now expected to be covered by a motor vessel)
C G N Winter Timetable
Mondays to Fridays
10th to 31st December 2007
So far, there are no Paddle Steamers advertised
to operate timetabled sailings during this period
However, following the decision to use MPV Vevey on the
early-Winter Mondays to Fridays sailings from Geneva
until the end of the annual 2006-2007 timetable
it is possible this arrangement may now continue
into the new timetable - at least until Christmas
(as was the case last year with PS Savoie) watch this space !